BioMax Boiler Tour.mpg


This is a video tour of a 1 Million Btu (300kw) BioMax boiler installed at Northwest Manufacturing in Red Lake Falls, MN. This installation was done in the fall of 2010 as one of the first commercial D’Alessandro Termomeccanica boilers in the US. Northwest Manufacturing (Woodmaster) will be manufacturing and assembling the BioMax boilers with full ASME certifications, right here in the US

http://www.youtube.com/v/tn7hyXtIgvw?version=3&f=videos&app=youtube_gdata

Go here to read the rest:
BioMax Boiler Tour.mpg

Comments are closed.

BioMax Boiler Tour.mpg


This is a video tour of a 1 Million Btu (300kw) BioMax boiler installed at Northwest Manufacturing in Red Lake Falls, MN. This installation was done in the fall of 2010 as one of the first commercial D’Alessandro Termomeccanica boilers in the US. Northwest Manufacturing (Woodmaster) will be manufacturing and assembling the BioMax boilers with full ASME certifications, right here in the US.

http://www.youtube.com/v/tn7hyXtIgvw?version=3&f=videos&app=youtube_gdata

Read more:
BioMax Boiler Tour.mpg

Tags: , , , , , , , , , , , ,

Comments are closed.