Charging the Earth – Solar!: Plumbing circuit update
14 May 2012: Apart from a bit of Insulation, the Plumbing seems to be completed. Insulation isn't needed at the moment as I am still checking for leaks, and the air temperature in the daytime at this time of the year in the loft is …
View original post here:
Charging the Earth – Solar!: Plumbing circuit update
Tags: air-temperature, daytime, insulation, loft, moment, still-checking, the-daytime, the-loft, the-moment, the-year, time, year