Final 310-tonne boilers pass through Berkeley


IT WAS the end of an era for Berkeley as the last two 310-tonne boilers were removed slowly but surely from the nuclear power station.

Read the original:
Final 310-tonne boilers pass through Berkeley

Tags: , , , , , , ,

Comments are closed.