Wednesday, September 5th, 2012
Up for consideration The Board of Finance and Legislative Council must vote on the replacement of the Hawley boiler system, the first phase of a multi-phase project. The proposed cost is $2.37 million.
More here:
Boards look to replace Hawley boilers
Tags: board, boiler-system, hawley, legislative, must-vote, proposed-cost, replacement, the-first, the-replacement
Posted in Uncategorized | Comments Off on Boards look to replace Hawley boilers
Friday, April 20th, 2012
Even a hole the size of a pencil tip can result in hundreds of gallons of water loss per day.
Read more:
Leak Detection and Repair | Campbell's Pool & Spa Blog
Tags: hole-the-size, more-serious, pencil-tip, pool, replacement, the-replacement, water-loss, will-increase, your-pool
Posted in Uncategorized | Comments Off on Leak Detection and Repair | Campbell's Pool & Spa Blog
Friday, April 13th, 2007
County Water System intends to select three engineering firms to prepare construction documents for the replacement of existing water mai…
Originally posted here:
RFP : Water Main Replacement in Georgia, United States
Tags: county-water, existing-water, prepare-construction, replacement, select-three, the-replacement, water
Posted in Uncategorized | Comments Off on RFP : Water Main Replacement in Georgia, United States