Hi, Using Revit MEP 2013, I have a toilet with a sanitary and cold water connection. The sanitary is already connected, I am trying to connect the two lengths of cold water piping, and no matter how I do it, it shifts the fixture as seen in pic2.
Read the original post:
Plumbing Fixtures Shifting