Posts Tagged ‘target’
Monday, September 10th, 2012
ALBANY, N.Y. — Leaks from the 85-mile Delaware Aqueduct that carries drinking water from upstate New York to New York City are the target of a project testing a new way to seal cracks in the tunnel.
Read this article:
New York City testing method to seal Delaware Aqueduct leaks …
Tags: delaware-aqueduct, department, from-upstate, new-way, project-testing, seal-cracks, target, tunnel
Posted in Uncategorized | Comments Off on New York City testing method to seal Delaware Aqueduct leaks …
Monday, September 10th, 2012
ALBANY, N.Y. — Leaks from the 85-mile Delaware Aqueduct that carries drinking water from upstate New York to New York City are the target of a project testing a new way to seal cracks in the tunnel.
Read this article:
New York City testing method to seal Delaware Aqueduct leaks …
Tags: delaware-aqueduct, department, project-testing, target
Posted in Uncategorized | Comments Off on New York City testing method to seal Delaware Aqueduct leaks …
Sunday, November 20th, 2011
The FBI and DHS are investigating damage to a public water system in Springfield, Illinois, which may have been the target of a foreign cyber attack. There's no threat to public safety and criminal interference has not been …
Read the rest here:
Water pump reportedly … – Tweet Leaks | Twitter News Source
Tags: been-the-target, dhs, fbi, foreign-cyber, illinois, public-safety, springfield, target, the-target
Posted in Uncategorized | Comments Off on Water pump reportedly … – Tweet Leaks | Twitter News Source
Wednesday, November 16th, 2011
LAUGHLIN – Boiler structures at the Mohave Generating Station will get a two-month reprieve as the last visible parts of Laughlin’s original skyscraper.
View post:
Generating station boilers to remain standing until January
Tags: boiler, mohave, mohave-generating, station, target, the-last, two-month-reprieve, visible-parts, will-get
Posted in Uncategorized | Comments Off on Generating station boilers to remain standing until January
Friday, November 11th, 2011
The Associated Press The Associated Press BULLHEAD CITY, Ariz. The implosion of two boiler structures at the Mohave Generating Station near Bullhead City has been pushed back into next year. Plans called for bringing them down later this month but the target date is now Jan
Go here to see the original:
Removal of generation station boilers delayed
Tags: bullhead, bullhead-city, city, down-later, mohave, month, perform-some, power, power-plant, station, target, target-date, two-boiler
Posted in Uncategorized | Comments Off on Removal of generation station boilers delayed